News

- Institute to Elaborate Scheduled Reconstruction Stages for Domodedovo Airport

Institute to Elaborate Scheduled Reconstruction Stages  for Domodedovo Airport

FSUE “Aeroproject” has won the open tenders for the implementation of engineering survey and elaboration of project documents on “Reconstruction and Development of Domodedovo Airport. Federal Property Objects (I and II Construction Stages), II Implementation Stage” and “Reconstruction of Second Maneuvering Area in Domodedovo Airport, II Implementation Stage”.

The Federal Agency for Air Transport is a customer acting through FSUE “Administration of Domodedovo Airport”.

The following works are provided:

·relocation of the existing utilities and structures out of the new runway construction area including main gas pipeline and oil-products pipeline;

·reconstruction of artificial pavements of the apron and taxiways, lighting facilities, drainage network, electric power supply system, and other objects; and

·construction of the perimeter fence of the airside.

16.05.20_Строительство АСС.JPG  16.10.04_Строительство новой ВПП.jpg

Construction of Aerodrome Complex Objects in Domodedovo Airport



On the topic:

08.10.2015 - Aeroproject Will Examine Runway 2 Pavements inDomodedovo Airport


Back to the list